Patrick Gerard to Cost-Benefit Analysis
This is a "connection" page, showing publications Patrick Gerard has written about Cost-Benefit Analysis.
Connection Strength
0.053
-
Multi-stage sampling for large scale natural resources surveys: a case study of rice and waterfowl. J Environ Manage. 2006 Mar; 78(4):353-61.
Score: 0.053
Connection Strength
The connection strength for concepts is the sum of the scores for each matching publication.
Publication scores are based on many factors, including how long ago they were written and whether the person is a first or senior author.