James Castle to Pilot Projects
This is a "connection" page, showing publications James Castle has written about Pilot Projects.
Connection Strength
0.036
-
Effects of simulated oilfield produced water on early seedling growth after treatment in a pilot-scale constructed wetland system. Int J Phytoremediation. 2015; 17(1-6):330-40.
Score: 0.022
-
Performance of a pilot-scale constructed wetland system for treating simulated ash basin water. Chemosphere. 2009 May; 75(7):939-47.
Score: 0.015